EV Charger Installation & Electrical System Upgrade – Westbourne

Overview

Mission Road was commissioned to upgrade the central electrical system and install electric vehicle (EV) chargers at a residential building in Westbourne. The project aimed to enhance the building's infrastructure while promoting sustainable transportation options for residents.

"Mission Road have been consistently careful, attentive, courteous, clean, pleasant - everything that you expect from a really good company. We could not be happier."

Lori Keen, Resident

Project Details

  • Location: Westbourne
  • Scope of Work:
    • Upgraded the central distribution board to the latest specifications, enhancing safety.
    • Replaced feed lines to three flats with sensitivity to the building's structure.
    • Installed six 7kW EV chargers in the car park, each assigned to individual flats via RFID cards.
  • Challenges Addressed:
    • Limited to two-phase power supply in the area, requiring tailored solutions.
    • Maintaining the building's aesthetics and minimizing disruption during installation.

Results

  • Achieved approximately 40% cost savings compared to quotes from national companies.
  • Enhanced building safety and infrastructure.
  • Provided residents with convenient and sustainable EV charging options.
  • Improved overall environment and reduced noise levels in the car park area.

Sustainability Impact

This project represents a significant step toward a greener future for the residents of Westbourne. By proactively upgrading the electrical system and installing EV chargers, the building is now better equipped to meet future regulations and support sustainable living.

Watch the Case Study

To gain deeper insights into the project and hear directly from the residents, watch the full video case study below: